{"id":44915,"date":"2022-06-07T06:56:01","date_gmt":"2022-06-07T10:56:01","guid":{"rendered":"https:\/\/www.wrfalp.com\/?p=44915"},"modified":"2022-06-07T06:56:01","modified_gmt":"2022-06-07T10:56:01","slug":"south-and-center-chautauqua-lake-sewer-districts-board-approve-phase-2-of-sewer-extension-project","status":"publish","type":"post","link":"https:\/\/www.wrfalp.com\/south-and-center-chautauqua-lake-sewer-districts-board-approve-phase-2-of-sewer-extension-project\/","title":{"rendered":"South and Center Chautauqua Lake Sewer Districts Board Approve Phase 2 of Sewer Extension Project"},"content":{"rendered":"
\"\"<\/a>

A new Grinder Pump installation in Phase 1 area.<\/p><\/div>\n

Phase 2 of the Westside Sewer Extension project<\/strong> has been approved.<\/p>\n

The South and Center Chautauqua Lake Sewer Districts<\/strong>\u2019 Board of Directors approved the map and plan report at its March meeting with the maximum amount to be spent on the project being $24 million.<\/p>\n

The South and Center Chautauqua Lake Sewer Districts (SCCLSD) initiated the construction of Phase 1 of the project in 2021. Phase 1 would extend the district to the Hamlet of Stow and it is anticipated to be complete in 2023. Phase 2 is ready to be initiated which will extend the Districts from the Hamlet of Stow to the North Chautauqua Lake Sewer District border, near Prendergast Creek.<\/p>\n

Board member and County Legislature Chairman Pierre Chagnon<\/strong> said the Westside Sewer Extension Phase 2 will complete the public sewers on the entire west side of Chautauqua Lake and is another milestone towards this end.<\/p>\n

The Phase 2 Extension will be comprised of properties on the western shore of the Lake in the Towns of North Harmony and Chautauqua, generally along New York State Route 394. The proposed wastewater collection and conveyance facilities will extend the public sewer and provide direct benefit to the estimated 350 developed parcels. The area is currently serviced by private septic systems and individually maintained by the corresponding property owner.<\/p>\n

Many of these systems are failing or reaching the end of their useful life. These failing systems are a contributor to elevated phosphorus levels within Chautauqua Lake and private water well contamination.<\/p>\n

The proposed improvements include the construction of a new low-pressure force main sewer system with approximately 250 grinder-pumping stations. Each developed parcel will be served by a grinder pumping station that connects to the sewer main located along the road of each property. All sanitary waste from each developed parcel would then be pumped to the Wastewater Treatment Facility, located in Celoron. Following the installation and connection to the grinder pumping station, the septic system would then be cleaned and decommissioned.<\/p>\n

The proposed Phase 2 project is eligible for State and Federal grant monies including New York State Department of Environmental Conservation<\/strong>\u2019s Water Quality Improvements Project<\/strong> (WQIP) and New York State Environmental Facilities Corporation<\/strong> (EFC)\u2019s Water Infrastructure Act<\/strong> (WIIA) funding. The County would be eligible to apply for a 30-year, interest-free loan through EFC\u2019s Clean Water State Revolving Fund<\/strong> program. The financial aid of these funding agencies will ensure that the Equivalent Dwelling Unit (EDU) cost does not exceed $1,000 per year.<\/p>\n","protected":false},"excerpt":{"rendered":"

Phase 2 of the Westside Sewer Extension project has been approved. The South and Center Chautauqua Lake Sewer Districts\u2019 Board of Directors approved the map and plan report at its March meeting with the maximum amount to be spent on the project being $24 million. The South and Center Chautauqua Lake Sewer Districts (SCCLSD) initiated […]<\/p>\n","protected":false},"author":22,"featured_media":44917,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_newsletter_tier_id":0,"footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[4],"tags":[6198,11585,10604,3027,8997,8443,11584,11583],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2022\/06\/Phase-1-Sewer.png?fit=494%2C279&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3YlJ4-bGr","jetpack-related-posts":[{"id":48024,"url":"https:\/\/www.wrfalp.com\/phase-2-of-westside-sewer-extension-awarded-6-million-from-nys\/","url_meta":{"origin":44915,"position":0},"title":"Phase 2 of Westside Sewer Extension Awarded $6 Million from NYS","author":"WRFA Radio","date":"November 7, 2022","format":false,"excerpt":"Phase Two of the Westside Sewer Extension project has been awarded $6 million in Water Infrastructure Improvement Grants from New York State. The funding is coming from the New York State Environmental Facilities Corporation and is part of $300 million announced by Governor Kathy Hochul for water infrastructure improvements across\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2022\/06\/Chq-Legislature-Sewer-Public-Hearing-6-22-22.png?fit=1123%2C719&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2022\/06\/Chq-Legislature-Sewer-Public-Hearing-6-22-22.png?fit=1123%2C719&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2022\/06\/Chq-Legislature-Sewer-Public-Hearing-6-22-22.png?fit=1123%2C719&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2022\/06\/Chq-Legislature-Sewer-Public-Hearing-6-22-22.png?fit=1123%2C719&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2022\/06\/Chq-Legislature-Sewer-Public-Hearing-6-22-22.png?fit=1123%2C719&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":49466,"url":"https:\/\/www.wrfalp.com\/phase-2-of-westside-sewer-extension-begins-this-spring\/","url_meta":{"origin":44915,"position":1},"title":"Phase 2 of Westside Sewer Extension Begins This Spring","author":"WRFA Radio","date":"January 18, 2023","format":false,"excerpt":"The South Chautauqua Lake Sewer District will begin the process this Spring for Phase 2 of the Westside Sewer Extension. The anticipated schedule for the Phase 2 project is to complete a project survey and design in Spring 2023 to Spring 2024, complete bidding and award a vendor with the\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2022\/06\/Chq-Legislature-Sewer-Public-Hearing-6-22-22.png?fit=1123%2C719&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2022\/06\/Chq-Legislature-Sewer-Public-Hearing-6-22-22.png?fit=1123%2C719&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2022\/06\/Chq-Legislature-Sewer-Public-Hearing-6-22-22.png?fit=1123%2C719&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2022\/06\/Chq-Legislature-Sewer-Public-Hearing-6-22-22.png?fit=1123%2C719&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2022\/06\/Chq-Legislature-Sewer-Public-Hearing-6-22-22.png?fit=1123%2C719&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":52451,"url":"https:\/\/www.wrfalp.com\/phase-one-of-westside-sewer-extension-project-now-complete\/","url_meta":{"origin":44915,"position":2},"title":"Phase One of Westside Sewer Extension Project Now Complete","author":"WRFA Radio","date":"June 13, 2023","format":false,"excerpt":"Officials cut the ribbon Monday in Stow on Phase 1 of the Westside Sewer Extension. The $16.9 million project brings sewer and water along Route 394 from Ashville to Stow and services approximately 450 developed properties in the Town of North Harmony. Chautauqua County Legislature Chairman and South & Center\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2023\/06\/Westside-Sewer-Phase-One-Ribbon-Cutting.jpg?fit=1000%2C750&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2023\/06\/Westside-Sewer-Phase-One-Ribbon-Cutting.jpg?fit=1000%2C750&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2023\/06\/Westside-Sewer-Phase-One-Ribbon-Cutting.jpg?fit=1000%2C750&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2023\/06\/Westside-Sewer-Phase-One-Ribbon-Cutting.jpg?fit=1000%2C750&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":39778,"url":"https:\/\/www.wrfalp.com\/ground-broken-for-16-8-million-sewer-extension-in-north-harmony\/","url_meta":{"origin":44915,"position":3},"title":"Ground Broken for $16.8 Million Sewer Extension in North Harmony","author":"WRFA Radio","date":"August 31, 2021","format":false,"excerpt":"Local officials gathered for the groundbreaking of the $16. 8 million Westside Sewer Extension Monday in Ashville. The South & Center Chautauqua Lake Sewer District project will provide public sewers on the west side of Chautauqua Lake along Route 394 up through Stow. The extension will service approximately 450 developed\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2021\/08\/20210830_112244-scaled.jpg?fit=1200%2C900&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2021\/08\/20210830_112244-scaled.jpg?fit=1200%2C900&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2021\/08\/20210830_112244-scaled.jpg?fit=1200%2C900&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2021\/08\/20210830_112244-scaled.jpg?fit=1200%2C900&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2021\/08\/20210830_112244-scaled.jpg?fit=1200%2C900&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":34870,"url":"https:\/\/www.wrfalp.com\/scclsd-board-of-directors-approves-sewer-extension-basis-of-design-engineering-report\/","url_meta":{"origin":44915,"position":4},"title":"SCCLSD Board of Directors Approves Sewer Extension Basis of Design Engineering Report","author":"WRFA Radio","date":"June 10, 2020","format":false,"excerpt":"MAYVILLE - [MEDIA RELEASE] - The South and Center Chautauqua Lake Sewer Districts (SCCLSD) Board of Directors recently met to discuss and approve the West Side Sewer Extension Basis of Design Report (BODR), submitted by GHD Engineering.\u00a0 The BODR is the baseline design report that includes information necessary to accomplish\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2020\/06\/Sewer-District.jpg?fit=556%2C417&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2020\/06\/Sewer-District.jpg?fit=556%2C417&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2020\/06\/Sewer-District.jpg?fit=556%2C417&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":27672,"url":"https:\/\/www.wrfalp.com\/nccwd-and-scclsd-receive-state-funding-for-drinking-and-clean-water-projects\/","url_meta":{"origin":44915,"position":5},"title":"NCCWD and SCCLSD Receive State Funding for Drinking and Clean Water Projects","author":"WRFA Radio","date":"December 14, 2018","format":false,"excerpt":"MAYVILLE - Chautauqua County was recently awarded $5,972,000 through New York State\u2019s Water Infrastructure Improvement Act (WIIA) program to help complete two water infrastructure projects. \u00a0The North Chautauqua County Water District received $3 million through the drinking water grant of the WIIA for its North Chautauqua County Regional Water Project.\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2011\/12\/chautauqua-county-seal-2006.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/44915"}],"collection":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/comments?post=44915"}],"version-history":[{"count":1,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/44915\/revisions"}],"predecessor-version":[{"id":44918,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/44915\/revisions\/44918"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/media\/44917"}],"wp:attachment":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/media?parent=44915"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/categories?post=44915"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/tags?post=44915"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}