{"id":38491,"date":"2021-06-10T08:11:22","date_gmt":"2021-06-10T12:11:22","guid":{"rendered":"https:\/\/www.wrfalp.com\/?p=38491"},"modified":"2021-06-10T08:11:22","modified_gmt":"2021-06-10T12:11:22","slug":"study-recommends-nrg-power-plant-be-redeveloped-as-a-data-center","status":"publish","type":"post","link":"https:\/\/www.wrfalp.com\/study-recommends-nrg-power-plant-be-redeveloped-as-a-data-center\/","title":{"rendered":"Study Recommends NRG Power Plant Be Redeveloped as a Data Center"},"content":{"rendered":"
A study on the potential reuse of the NRG Power Plant<\/strong> in the City of Dunkirk recommended redeveloping the site as a data center. The City of Dunkirk<\/strong>, Chautauqua County<\/strong>, and consultant, Bergmann<\/strong>, presented the findings on Tuesday.<\/p>\n The study concluded that, overall, the redevelopment strategy for the NRG Power Plant would have the greatest benefits if it allowed the community to access workforce development opportunities, generated tax revenue, included a clean energy component, supported public access to the waterfront, and aided in comprehensive economic development for the region.<\/p>\n The study also includes recommendations of immediate next steps that the City of Dunkirk and Chautauqua County should advance in order to better understand site\/building constraints and future opportunities, to position the site for funding to facilitate redevelopment. These include: continuing to collaborate with NRG Energy; pursuing a Build-Ready Program Application through NYSERDA; conducting additional environmental investigations; investigating interconnection costs; completing energy modeling; collaborating with the NYS Climate Justice Working Group; and performing site marketing and promotion.<\/p>\n The NRG Power Plant operated from the 1950s until 2015. It was officially mothballed in 2016, with the decommissioning process beginning in 2020. The NRG Power Plant was an economic engine in the City of Dunkirk, contributing to approximately 40 percent of the City\u2019s tax base and providing close to 150 well-paying jobs at its peak.<\/p>\n The study was funded by a $60,000 Appalachian Regional Commission POWER grant with local matching funds from the City of Dunkirk, the County IDA, and the Northern Chautauqua Community Foundation.<\/p>\n","protected":false},"excerpt":{"rendered":" A study on the potential reuse of the NRG Power Plant in the City of Dunkirk recommended redeveloping the site as a data center. The City of Dunkirk, Chautauqua County, and consultant, Bergmann, presented the findings on Tuesday. The study concluded that, overall, the redevelopment strategy for the NRG Power Plant would have the greatest […]<\/p>\n","protected":false},"author":22,"featured_media":38492,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_newsletter_tier_id":0,"footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[4],"tags":[8336,5033,731,1723],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2021\/06\/image002.jpg?fit=389%2C292&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3YlJ4-a0P","jetpack-related-posts":[{"id":26399,"url":"https:\/\/www.wrfalp.com\/ida-announces-feasibility-study-for-shuddered-nrg-power-plant\/","url_meta":{"origin":38491,"position":0},"title":"IDA Announces Feasibility Study for Shuddered NRG Power Plant","author":"WRFA Radio","date":"August 29, 2018","format":false,"excerpt":"DUNKIRK - The Chautauqua County Industrial Development Agency says it will be moving forward with trying to complete a feasibility study to determine the future of the NRG power plant in Dunkirk. The Post-Journal is reporting that during the IDA's monthly meeting on Tuesday, executive director Mark Geise informed the\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":28882,"url":"https:\/\/www.wrfalp.com\/dunkirk-to-receive-60000-federal-grant-for-nrg-power-plant-feasibility-study\/","url_meta":{"origin":38491,"position":1},"title":"Dunkirk to Receive $60,000 Federal Grant for NRG Power Plant Feasibility Study","author":"WRFA Radio","date":"February 22, 2019","format":false,"excerpt":"DUNKIRK - Congressman Tom Reed Thursday announced a $60,000 grant to the city of Dunkirk to help cover the cost of a redevelopment feasibility study of the NRG power plant site. In the summer of 2018, NRG announced it would not pursue repowering the plant due to the costs involved.\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":8074,"url":"https:\/\/www.wrfalp.com\/rally-for-nrg-power-plant-set-for-saturday\/","url_meta":{"origin":38491,"position":2},"title":"Rally for NRG Power Plant Set for Saturday","author":"WRFA Radio","date":"December 6, 2013","format":false,"excerpt":"DUNKIRK - A major rally will be taking place on Saturday in Dunkirk in an effort to show solidarity and support for saving the NRG Power Plant. Assemblyman Andy Goodell (R,C,I-Chautauqua) is encouraging local residents to join him, Senator Cathy Young, union members, the Chautauqua County Chamber of Commerce, and\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2013\/12\/Dunkirk-Power-Plant.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2013\/12\/Dunkirk-Power-Plant.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2013\/12\/Dunkirk-Power-Plant.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2013\/12\/Dunkirk-Power-Plant.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":8169,"url":"https:\/\/www.wrfalp.com\/dunkirk-power-plant-to-convert-to-natural-gas-facility-will-remain-open\/","url_meta":{"origin":38491,"position":3},"title":"Dunkirk Power Plant to Convert to Natural Gas Facility, Will Remain Open","author":"WRFA Radio","date":"December 16, 2013","format":false,"excerpt":"DUNKIRK - The largest taxpayer in Chautauqua County will remain in operation. On Sunday morning, Governor Andrew Cuomo paid a visit to Dunkirk to announce that funding will be in place to repower the NRG power plant into a natural gas generating facility. The governor was joined by several other\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":25786,"url":"https:\/\/www.wrfalp.com\/nrg-wont-pursue-repowering-of-dunkirk-power-plant-due-to-reconnection-cost\/","url_meta":{"origin":38491,"position":4},"title":"NRG Won’t Pursue Repowering of Dunkirk Power Plant Due to Reconnection Cost","author":"WRFA Radio","date":"July 11, 2018","format":false,"excerpt":"DUNKIRK - The effort to repower Chautauqua County\u2019s largest property taxpayer appears to be over for good. That\u2019s according to the Jamestown Post-Journal, which reports Wednesday that county officials were made aware Monday of NRG\u2019s decision to back off from the plant\u2019s conversion from coal to a cleaner alternative in\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=525%2C300 1.5x"},"classes":[]},{"id":16145,"url":"https:\/\/www.wrfalp.com\/nrg-plant-in-dunkirk-can-be-closed-without-impacting-power-generation-in-new-york\/","url_meta":{"origin":38491,"position":5},"title":"NRG Plant in Dunkirk Can be Closed Without Impacting Power Generation in New York","author":"WRFA Radio","date":"November 2, 2015","format":false,"excerpt":"ALBANY - It\u2019s not looking good for the future of the NRG power plant in Dunkirk. A recently released\u00a0 study shows the NRG plant, along with another in Tonawanda, can be shut down without affecting energy reliability to the region\u2019s businesses, homes and other customers. The report by the New\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/11\/NRG-Plant.jpg?fit=533%2C310&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/38491"}],"collection":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/comments?post=38491"}],"version-history":[{"count":1,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/38491\/revisions"}],"predecessor-version":[{"id":38493,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/38491\/revisions\/38493"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/media\/38492"}],"wp:attachment":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/media?parent=38491"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/categories?post=38491"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/tags?post=38491"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}