Sam Teresi<\/strong> had said the departments were susceptible to water damage and flooding even before work began.<\/p>\n“Tracy Plaza was in desperate need of repair because, as the City’s Mayor said to Spectrum News on January 4, 2017, the plaza ‘has literally been deteriorating and leaking since day one when the building opened back in 1970,'” it said in its legal complaint.<\/p>\n
The firm also claims the city delayed the start of the project in the summer of 2017 by at least one month. It also says that it undertook efforts to protect the surface below the plaza deck from water and moisture, including the installation of a temporary roof. But in April 2018, the city issued a stop work order for the project and ordered Patterson-Stevens to remove the temporary roof. As a result, the firm claims that any damage that was done after April 2018 was due to the city’s improper stop work order. The city then withheld payments to the firm for work that was already done or which continued to take place.<\/p>\n
According to the lawsuit, Patterson-Stevens says, “The City has breached the contract by delaying the start of the project, issuing an improper stop work order, interfering with Patterson-Stevens’ performance of the contract, improperly withholding payment or failing to pay or reject invoices as required by the Contract, and improperly delaying completion of the project well beyond the June 30, 2018 completion date.”<\/p>\n
Due to its claim, Patterson Stevens says it has suffered monetary damages in the amount of at least $306,048. It is asking the court to not only order the release of the payment, but also pay any interest, attorneys’ fees, costs, and disbursements, along with any further relief as the court deems necessary and proper.<\/p>\n","protected":false},"excerpt":{"rendered":"
MAYVILLE – The contractor that was hired by the city of Jamestown to oversee Phase 2 of the renovation work on Tracy Plaza is suing the city for breech of contract. Specifically, Patterson-Stevens Inc., based out of Tonawanda, is claiming the city owes over $306,000 in back payment for work that was done at Tracy […]<\/p>\n","protected":false},"author":22,"featured_media":13689,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_newsletter_tier_id":0,"footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[4],"tags":[8502,10136,1157,7890,1984,2839],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/04\/IMG_0491.jpg?fit=1632%2C939&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3YlJ4-9a6","jetpack-related-posts":[{"id":51495,"url":"https:\/\/www.wrfalp.com\/city-council-to-vote-on-settlement-to-end-litigation-between-city-and-company-hired-to-renovate-tracy-plaza\/","url_meta":{"origin":35222,"position":0},"title":"City Council to Vote on Settlement to End Litigation Between City and Company Hired to Renovate Tracy Plaza","author":"WRFA Radio","date":"April 24, 2023","format":false,"excerpt":"Jamestown City Council will vote on a settlement to end litigation between the City and the company hired to renovate Tracy Plaza. The City of Jamestown hired Patterson-Stevens in 2017 to renovate Tracy Plaza, which sits above and also serves as the roof for the city police and fire departments\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/04\/IMG_0491.jpg?fit=1200%2C690&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/04\/IMG_0491.jpg?fit=1200%2C690&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/04\/IMG_0491.jpg?fit=1200%2C690&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/04\/IMG_0491.jpg?fit=1200%2C690&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/04\/IMG_0491.jpg?fit=1200%2C690&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":51531,"url":"https:\/\/www.wrfalp.com\/jamestown-city-council-approves-settlement-with-company-hired-to-renovate-tracy-plaza\/","url_meta":{"origin":35222,"position":1},"title":"Jamestown City Council Approves Settlement With Company Hired to Renovate Tracy Plaza","author":"WRFA Radio","date":"April 26, 2023","format":false,"excerpt":"Jamestown City Council has approved a settlement to end litigation between the City and the company hired to renovate Tracy Plaza. The City of Jamestown hired Patterson-Stevens in 2017 to renovate Tracy Plaza, which sits above and also serves as the roof for the city police and fire departments along\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2023\/04\/City-Council-4-24-23.jpg?fit=1000%2C750&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2023\/04\/City-Council-4-24-23.jpg?fit=1000%2C750&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2023\/04\/City-Council-4-24-23.jpg?fit=1000%2C750&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2023\/04\/City-Council-4-24-23.jpg?fit=1000%2C750&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":28838,"url":"https:\/\/www.wrfalp.com\/city-insurance-company-sue-contractor-over-damage-to-police-department-city-hall\/","url_meta":{"origin":35222,"position":2},"title":"City, Insurance Company Sue Contractor Over Damage to Police Department, City Hall","author":"WRFA Radio","date":"February 19, 2019","format":false,"excerpt":"JAMESTOWN - The Jamestown Post-Journal is reporting that the city of Jamestown and its insurance carrier are suing the contractor they believe is responsible for causing millions of dollars in water damage to the Jamestown Police Department\u00a0headquarters and other areas of city hall. The city and New York Municipal Insurance\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2014\/08\/JamestownSeal.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":26723,"url":"https:\/\/www.wrfalp.com\/tracy-plaza-construction-results-in-another-roof-leak\/","url_meta":{"origin":35222,"position":3},"title":"Tracy Plaza Construction Results in Another Roof Leak","author":"WRFA Radio","date":"September 17, 2018","format":false,"excerpt":"JAMESTOWN - The City of Jamestown is experiencing more leaking roof problems at City Hall. On Monday night during the Jamestown City Council work session it was learned that a portion of the Fire Department - located below Tracy Plaza at City Hall - has been damaged due to rain\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/04\/IMG_0491.jpg?fit=1200%2C690&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/04\/IMG_0491.jpg?fit=1200%2C690&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/04\/IMG_0491.jpg?fit=1200%2C690&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/04\/IMG_0491.jpg?fit=1200%2C690&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2015\/04\/IMG_0491.jpg?fit=1200%2C690&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":22937,"url":"https:\/\/www.wrfalp.com\/city-police-department-closed-to-public-until-further-notice-due-to-flooding\/","url_meta":{"origin":35222,"position":4},"title":"City Police Department Closed to Public Until Further Notice Due to Flooding","author":"WRFA Radio","date":"September 15, 2017","format":false,"excerpt":"JAMESTOWN - The cleanup continues at the Jamestown Police Station on 2nd Street after it was flooded with water from a rain storm that passed late Wednesday night and early Thursday morning. According to the Jamestown Post-Journal, the general contractors working on the Tracy Plaza reconstruction project \u2014 Patterson-Stevens Inc.\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2013\/02\/jamestownpolice.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":24392,"url":"https:\/\/www.wrfalp.com\/work-continues-on-jamestown-police-department-headquarters-with-city-council-action\/","url_meta":{"origin":35222,"position":5},"title":"Work Continues on Jamestown Police Department Headquarters with City Council Action","author":"WRFA Radio","date":"February 27, 2018","format":false,"excerpt":"JAMESTOWN The Jamestown City Council took action Monday night on three resolutions involving work to the Jamestown Police Department to address damages that were done during a flooding incident last year. The council approved an agreement with LaBella Associates of Jamestown as part of police department Emergency Repairs Phase 2\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2018\/02\/JPD-Repairs.jpg?fit=640%2C480&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2018\/02\/JPD-Repairs.jpg?fit=640%2C480&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2018\/02\/JPD-Repairs.jpg?fit=640%2C480&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/35222"}],"collection":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/comments?post=35222"}],"version-history":[{"count":5,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/35222\/revisions"}],"predecessor-version":[{"id":35227,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/35222\/revisions\/35227"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/media\/13689"}],"wp:attachment":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/media?parent=35222"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/categories?post=35222"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/tags?post=35222"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}