{"id":31705,"date":"2019-11-08T08:06:45","date_gmt":"2019-11-08T13:06:45","guid":{"rendered":"http:\/\/www.wrfalp.com\/?p=31705"},"modified":"2019-11-11T10:14:01","modified_gmt":"2019-11-11T15:14:01","slug":"harrison-street-bridge-completions-schedule-pushed-back-to-december","status":"publish","type":"post","link":"https:\/\/www.wrfalp.com\/harrison-street-bridge-completions-schedule-pushed-back-to-december\/","title":{"rendered":"Harrison Street Bridge Completions Schedule Pushed Back to December"},"content":{"rendered":"
\"\"<\/a>

County bridge 1077 on Harrison St. in Jamestown, viewed from Institute Street. (Image courtesy of Google Maps)<\/em><\/p><\/div>\n

JAMESTOWN – The replacement of the Harrison Street Bridge<\/strong> over the Chadakoin River in the City of Jamestown continues to progress towards opening by the end of this year.<\/p>\n

However, the original timeline of a November completion is no longer projected and instead, officials say it should be done by the end of December.\u00a0 That is mostly due to difficulties with soil conditions recently encountered, which forced additional construction activities to take place in order to properly construct the replacement bridge foundations.<\/p>\n

The bridge is being replaced by the Chautauqua County Department of Public Facilities<\/strong> and director Brad Brentley<\/strong> said the contractor is prepared to work in the colder weather to re-open the bridge, however extreme winter weather may impact this revised schedule.<\/p>\n","protected":false},"excerpt":{"rendered":"

JAMESTOWN – The replacement of the Harrison Street Bridge over the Chadakoin River in the City of Jamestown continues to progress towards opening by the end of this year. However, the original timeline of a November completion is no longer projected and instead, officials say it should be done by the end of December.\u00a0 That […]<\/p>\n","protected":false},"author":22,"featured_media":29819,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_newsletter_tier_id":0,"footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false}}},"categories":[4],"tags":[8610,405,9326],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/05\/harrison-street-bridge.jpg?fit=1197%2C675&ssl=1","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3YlJ4-8fn","jetpack-related-posts":[{"id":29817,"url":"https:\/\/www.wrfalp.com\/harrison-street-bridge-slated-for-replacement-in-2019-construction-season\/","url_meta":{"origin":31705,"position":0},"title":"Harrison Street Bridge Slated for Replacement in 2019 Construction Season","author":"WRFA Radio","date":"May 2, 2019","format":false,"excerpt":"JAMESTOWN - It appears another bridge in Jamestown will be closing down later this construction season, causing detours and delays for commuters trying to make it across town. Just months after the county finished the extensive overhaul of the South Main Street Bridge in Jamestown, with final finishing touches being\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/05\/harrison-street-bridge.jpg?fit=1197%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/05\/harrison-street-bridge.jpg?fit=1197%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/05\/harrison-street-bridge.jpg?fit=1197%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/05\/harrison-street-bridge.jpg?fit=1197%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/05\/harrison-street-bridge.jpg?fit=1197%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":30444,"url":"https:\/\/www.wrfalp.com\/harrison-street-bridge-near-institute-street-to-close-july-1-for-replacement\/","url_meta":{"origin":31705,"position":1},"title":"Harrison Street Bridge Near Institute Street to Close July 1 for Replacement","author":"WRFA Radio","date":"June 19, 2019","format":false,"excerpt":"JAMESTOWN - Motorists that use Harrison Street in downtown Jamestown will have to find an alternate route of travel for several months as county highway crews work to replace a bridge starting in July. As WRFA first reported in early May, the Harrison Street Bridge near Institute Street is overdue\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/05\/harrison-street-bridge.jpg?fit=1197%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/05\/harrison-street-bridge.jpg?fit=1197%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/05\/harrison-street-bridge.jpg?fit=1197%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/05\/harrison-street-bridge.jpg?fit=1197%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/05\/harrison-street-bridge.jpg?fit=1197%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":30595,"url":"https:\/\/www.wrfalp.com\/portions-of-harrison-street-foote-avenue-to-be-temporarily-closed-to-traffic-starting-in-july\/","url_meta":{"origin":31705,"position":2},"title":"Portions of Harrison Street, Foote Avenue to be Temporarily Closed to Traffic Starting in July","author":"WRFA Radio","date":"July 1, 2019","format":false,"excerpt":"JAMESTOWN - A reminder that the Harrison Street Bridge in Jamestown, next to the intersection with Institute Street, will be closed for replacement starting Monday, July 1 and will likely remain closed until November. The work is being coordinated by the Chautauqua County Department of Public Facilities. In addition, starting\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/07\/Construction-Map-Jamestown.jpg?fit=779%2C629&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/07\/Construction-Map-Jamestown.jpg?fit=779%2C629&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/07\/Construction-Map-Jamestown.jpg?fit=779%2C629&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2019\/07\/Construction-Map-Jamestown.jpg?fit=779%2C629&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":32099,"url":"https:\/\/www.wrfalp.com\/harrison-street-water-line-to-be-restored-wednesday-night\/","url_meta":{"origin":31705,"position":3},"title":"Harrison Street Water Line to be Restored Wednesday Night","author":"WRFA Radio","date":"December 18, 2019","format":false,"excerpt":"JAMESTOWN - Jamestown Board of Public Utilities (BPU) Water employees will restore use of the Harrison Street water line Wednesday evening, Dec. 18. The line has been out of service since July, as part of the Harrison Street Bridge Reconstruction Project. Employees will restore service to the line, effective 8:30\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"BPU","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2013\/10\/BPU.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":29570,"url":"https:\/\/www.wrfalp.com\/portion-of-main-street-to-close-for-two-weeks-to-complete-final-work-on-bridge\/","url_meta":{"origin":31705,"position":4},"title":"Portion of Main Street to Close for Two Weeks to Complete Final Work on Bridge","author":"WRFA Radio","date":"April 10, 2019","format":false,"excerpt":"JAMESTOWN - A portion of Main Street in downtown Jamestown will once again be closed to traffic - but only for a limited time. JAMESTOWN - The Chautauqua County Department of Public Facilities say that beginning Monday, South Main Street in Jamestown between First and Harrison streets will be closed\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2018\/11\/image005.jpg?fit=417%2C313&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":26673,"url":"https:\/\/www.wrfalp.com\/main-street-bridge-will-reopen-to-traffic-by-november-30\/","url_meta":{"origin":31705,"position":5},"title":"Main Street Bridge will Reopen to Traffic By November 30","author":"WRFA Radio","date":"September 28, 2018","format":false,"excerpt":"JAMESTOWN - The Chautauqua County Department of Public Facilities recently announced that a major construction milestone was completed for the South Main Street Bridge, which is located between First and Harrison Streets in Jamestown. The bridge\u2019s concrete relieving slab was poured on Sept. 21 and after a 14-day curing period,\u2026","rel":"","context":"In "Local News"","block_context":{"text":"Local News","link":"https:\/\/www.wrfalp.com\/category\/news\/local-news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2018\/09\/image005.jpg?fit=570%2C429&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2018\/09\/image005.jpg?fit=570%2C429&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/www.wrfalp.com\/wp-content\/uploads\/2018\/09\/image005.jpg?fit=570%2C429&ssl=1&resize=525%2C300 1.5x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/31705"}],"collection":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/comments?post=31705"}],"version-history":[{"count":1,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/31705\/revisions"}],"predecessor-version":[{"id":31706,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/posts\/31705\/revisions\/31706"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/media\/29819"}],"wp:attachment":[{"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/media?parent=31705"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/categories?post=31705"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wrfalp.com\/wp-json\/wp\/v2\/tags?post=31705"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}