WRFA-LP 107.9 FM

A listener supported, non-commercial, low power FM radio station in Jamestown, NY.


Stream WRFA

  • Home
  • News
    • Local News
    • WRFA Election Coverage 2023
    • WRFA Noticias En Español
    • Local Arts and Entertainment
    • Station News and Events
    • Audio Posts
    • Video
  • Listen
  • Programming Guide
    • Interactive Schedule
    • Arts on Fire LIVE
    • I Remember
    • Jamestown Tarp Skunks on WRFA
    • YWCA Jamestown Broadscast
  • Local Shows
    • Alex’s Variety Hour
    • Arts on Fire
    • Arts on Fire LIVE
    • Chautauqua Lectures
    • Chautauqua Sunrise with Doc Hamels
    • Community Matters
    • Da Platform
    • Da Unwind
    • Diamond Run Radio
    • The Latin Inspiration
    • Local Rush Hour
    • Power Chord Hour
    • Remembering Rock n Roll
    • Small Things Considered
    • Stormin Norman’s Prime Time Sports Show
    • The Swedish Hour
    • Third Street Garage
    • YWCA Jamestown Broadscast
  • Audio Vault
  • About
    • Join the WRFA Team
    • E-Newsletter Sign Up
  • Donate
    • WRFA Supporters
  • Contact
You are here: Home / News / Local News / Portion of Main Street to Close for Two Weeks to Complete Final Work on Bridge

Portion of Main Street to Close for Two Weeks to Complete Final Work on Bridge

April 10, 2019 By WRFA Radio Leave a Comment

The South Main St. Bridge in November 2018

JAMESTOWN – A portion of Main Street in downtown Jamestown will once again be closed to traffic – but only for a limited time.

JAMESTOWN – The Chautauqua County Department of Public Facilities say that beginning Monday, South Main Street in Jamestown between First and Harrison streets will be closed to traffic as crews work to put a final overlay on the Main Street bridge.

The work is the final step in the $4.2 million dollar bridge rehabilitation project, that saw the bridge closed to traffic for much of 2017 and 2018.

In addition to a final layer of asphalt, crews will also install a crosswalk for the Riverwalk trail along with other related work. Most of the project was funded by grant money from the federal government, with 20 percent covered by the county.

That area of Main Street will be closed on Monday, April 15 and should be reopened by Friday, April 26.

Share this:

  • Click to share on Facebook (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Tumblr (Opens in new window)
  • Click to email a link to a friend (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to share on Reddit (Opens in new window)
  • Click to share on Pocket (Opens in new window)
  • Click to print (Opens in new window)

Filed Under: Local News Tagged With: Chautauqua County Department of Public Facilities, Main Street Bridge

Donate to WRFA and help support Community Radio in Jamestown, NY.

Leave a Reply Cancel reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Licensed by Reg Lenna Center for the Arts

Reg Lenna
Reg Lenna

On Air Now

Stream WRFA

Corporate Support

Donate to WRFA

Recently Played Songs

Tweets by @WRFASpins
Donate to WRFA

Recent News

  • [LISTEN] Your Spending Swap With John Cross – Episode 3
  • [LISTEN] Arts on Fire – KDYN
  • [LISTEN] Arts on Fire – Len Barry
WRFA LP 107.9 FM is licensed by the Reg Lenna Center for the Arts in Jamestown, NY.

Copyright © 2023 WRFALP.com 107.9 FM

 

Loading Comments...