WRFA-LP 107.9 FM

A listener supported, non-commercial, low power FM radio station in Jamestown, NY.


Stream WRFA

  • Home
  • News
    • Local News
    • WRFA Election Coverage 2023
    • WRFA Noticias En Español
    • Local Arts and Entertainment
    • Station News and Events
    • Audio Posts
    • Video
  • Listen
  • Programming Guide
    • Interactive Schedule
    • Arts on Fire LIVE
    • I Remember
    • Jamestown Tarp Skunks on WRFA
    • YWCA Jamestown Broadscast
  • Local Shows
    • Alex’s Variety Hour
    • Arts on Fire
    • Arts on Fire LIVE
    • Chautauqua Lectures
    • Chautauqua Sunrise with Doc Hamels
    • Community Matters
    • Da Platform
    • Da Unwind
    • Diamond Run Radio
    • The Latin Inspiration
    • Local Rush Hour
    • Power Chord Hour
    • Remembering Rock n Roll
    • Small Things Considered
    • Stormin Norman’s Prime Time Sports Show
    • The Swedish Hour
    • Third Street Garage
    • YWCA Jamestown Broadscast
  • Audio Vault
  • About
    • Join the WRFA Team
    • E-Newsletter Sign Up
  • Donate
    • WRFA Supporters
  • Contact
You are here: Home / News / Local News / Chautauqua Institution Moves Forward with Amphitheater Construction Project

Chautauqua Institution Moves Forward with Amphitheater Construction Project

January 5, 2016 By WRFA Radio Leave a Comment

The current Chautauqua Amphitheater, which is scheduled to be replaced by a new Amp before the start of the 2017 summer season.

The current Chautauqua Amphitheater, which is scheduled to be replaced by a new Amp before the start of the 2017 summer season.

JAMESTOWN – Another hurdle has been cleared in the effort to construct a new multi-million dollar amphitheater at Chautauqua Institution.

Last week Chautauqua’s Board of Trustees voted to move forward with its Amphitheater renewal project and authorized the Institution staff to award the construction contract to LPCiminelli, Inc., of Buffalo, which will serve as the project’s construction manager.

The Board also approved the final design of the renewed Amphitheater, a state-of-the-art facility that honors the look and feel of the original structure, a requirement Chautauquans emphasized throughout the four years of community input to the project.

The project cost will be $41.5 million, which includes contingency funds for changes that may arise during the construction process.   Construction will begin in early February and continue, but will pause for the 2016 season, then resume in the fall. A grand opening of the renewed Amp is slated to take place prior to the start of Chautauqua’s 2017 season.

Share this:

  • Click to share on Facebook (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Tumblr (Opens in new window)
  • Click to email a link to a friend (Opens in new window)
  • Click to share on Pinterest (Opens in new window)
  • Click to share on Reddit (Opens in new window)
  • Click to share on Pocket (Opens in new window)
  • Click to print (Opens in new window)

Filed Under: Local News Tagged With: Chautauqua Amphitheater, Chautauqua Institution, LPCiminelli

Donate to WRFA and help support Community Radio in Jamestown, NY.

Leave a Reply Cancel reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Licensed by Reg Lenna Center for the Arts

Reg Lenna
Reg Lenna

On Air Now

Stream WRFA

Corporate Support

Donate to WRFA

Recently Played Songs

Tweets by @WRFASpins
Donate to WRFA

Recent News

  • [LISTEN] JHS Poetry 2023: Poetry Is…
  • [LISTEN] Community Matters – Dr. Kevin Sabet – May 18, 2023
  • County Executive Wendel Declares State of Emergency Barring Housing of Additional Immigrants in County
WRFA LP 107.9 FM is licensed by the Reg Lenna Center for the Arts in Jamestown, NY.

Copyright © 2023 WRFALP.com 107.9 FM

 

Loading Comments...